A part of the Planning Meter check
Time estimates
How much time is planned for getting ready, travelling and a full day, and how often it is enough.
What this part captures
How much time is planned for getting ready, travelling and a full day. The four statements ask about adding extra time for a journey, getting ready taking longer than counted on, using past experience when estimating, and days off planned so full that something gets left out.
How it shows in everyday life
“We will leave at nine” and leaving at eleven. A party prepared in two evenings instead of one afternoon. A move planned for a weekend that took three. A Saturday with five things on the list, of which three got done.
The planning fallacy
People tend to underestimate how long their own tasks will take, even when similar tasks ran late before (Buehler, Griffin & Ross, 1994). They focus on the plan for this case and treat past delays as exceptions. Listing all the parts of a task made estimates longer and closer to the real time in several studies (Kruger & Evans, 2004), though not in every later study.
More in the article Why everything takes longer than planned
What research says
The planning fallacy is the tendency to underestimate how long one's own tasks will take, even with experience of similar tasks running late (Buehler, Griffin & Ross, 1994). When predicting, people focus on the plan for this case and set aside memories of past delays. Breaking a task into its parts made estimates longer and closer to reality in several studies (Kruger & Evans, 2004), though not every later study found the same.
Towards the first end (0–39)
In your answers, time is often planned tightly and things take longer.
In the middle (40–60)
In your answers, time estimates are sometimes enough and sometimes not.
Towards the second end (61–100)
In your answers, time is usually planned with some to spare.
Ideas people in a similar place try
- How long did the last move, party or packing really take, compared with the plan?
- Some people estimate a trip by listing all the small steps: packing, fuel, a stop, parking.
- Which part of getting ready tends to take longer than expected?
Only if it suits you; you decide.
Planning Meter
Do you plan, or go with the flow?
20 short statements, about five minutes. Free, no account; your answers stay on your device.
Take the free quizSources
- Buehler, R., Griffin, D., & Ross, M. (1994). Exploring the “planning fallacy”: Why people underestimate their task completion times. Journal of Personality and Social Psychology, 67(3), 366–381.
- Kruger, J., & Evans, M. (2004). If you don’t want to be late, enumerate: Unpacking reduces the planning fallacy. Journal of Experimental Social Psychology, 40(5), 586–598.